Moving a process between sites and the enormous amount of implicit knowledge that does not travel in a document.

Governing number · what the document omits 5 min read Stage SC of six
Two business professionals walking through an unfinished room with a wooden ladder
Moving a process between sites and the enormous amount of implicit knowledge that does not travel in a document.Photo: cottonbro studio / Pexels

The document is not the process

When a biologic leaves the development lab and moves to a manufacturing site — whether across a campus or across an ocean — a thick binder travels with it. Batch records, operating parameters, equipment specifications, analytical methods: the transfer package is thorough by design, and regulators expect it to be. It is also, almost always, insufficient.

The gap between what is written down and what actually runs is where tech transfer lives. The document captures the process as its authors understood it. It does not capture what the operators learned to do with their hands, which alarm they have always ignored, how they judge the colour of a cell suspension, or why the upstream team at the originating site never runs a fed-batch past a certain osmolality even though the SOP permits it. That knowledge is tacit — held in people, not paper — and it does not travel unless the people do.

What the receiving site is inheriting

A manufacturing site taking on a new molecule is inheriting a process that was optimised in conditions it does not share. Equipment geometry differs: a paddle impeller in a development bioreactor is not the same flow environment as the rushton turbine in the receiving plant, even at identical tip speeds. Facility air-handling, water-for-injection loop temperatures, ambient humidity — all of these shape outcomes in ways that rarely make it into a transfer document because, at the originating site, they were just the background. They became assumptions rather than parameters.

Cell lines arrive as frozen vials, and the receiving site must thaw, expand and bank them in its own consumables, its own media formulation — possibly from a different supplier's lot — in vessels it has calibrated with its own instruments. Each of those differences is small. Together they create a process that is recognisably the same and practically different. The first engineering runs at the receiving site exist to find out where those differences bite.

Analytical transfer compounds this. The assays that characterise the molecule must be re-established in the receiving quality laboratory, and some of them — potency assays especially — are notoriously difficult to reproduce even between two trained teams using identical reagents. A result that looks like a process failure at the new site is sometimes an assay transfer failure instead. Disentangling the two is slow.

A stainless steel bioreactor with sanitary clamps and instrumentation, cleanroom light
The vessel is the cheap part of the room; what surrounds it sets the schedule.Photo: generated

Where transfers fail

The proximate cause is usually one of three things: a process parameter that was never identified as critical because it never varied at the sending site; a raw-material attribute that was controlled informally rather than by specification; or a timeline that assumed knowledge transfer would be complete before the equipment campaign began. All three reduce to the same underlying problem — the process was not as well understood as the documentation implied.

Compressed timelines are nearly universal. The manufacturing site may be accepting the process while clinical trials are still running, because the commercial launch schedule demands it. That pressure pushes parallel workstreams — analytical transfer, equipment qualification, operator training — into a sequence that creates interdependencies no one planned for. A deviation in engineering run two holds up validation planning for runs three and four, which holds up a regulatory submission that was written assuming those runs would be clean.

The regulatory dimension adds its own weight. Any change between the process as developed and the process as transferred must be evaluated for comparability. If changing the process mid-programme requires demonstrating that the product is the same before and after, so does transferring it between sites. The receiving site is not simply replicating — it is, in the regulatory sense, making a change, and it must generate data to show the molecule emerging from its bioreactors is the same molecule the clinical programme characterised.

Lifted out · 01

What the transfer package contains — and what it misses

  • Batch records and SOPsthe formal backbone of any transfer package
  • Critical process parametersnumeric ranges that the receiving site must stay within
  • Tacit knowledgeexperiential understanding held by operators, rarely written down
  • Equipment geometryimpeller type, vessel dimensions; small differences with real consequences
  • Assay transferre-establishing analytical methods in a new laboratory, where potency assays are hardest

What actually moves

The organisations that transfer processes well have learned that the document package is the starting point, not the deliverable. What moves well is people: scientists from the sending site embedded at the receiving site for the first engineering runs, not to supervise but to be present when something unexpected happens and recognise it. The question "has this happened before?" is often the most valuable thing a transfer team carries.

The hard knowledge eventually becomes written — in deviation reports, in updated SOPs, in notes added to batch records after the fact. The receiving site, once it has run the process through its own difficulties, holds the process better than the transfer package suggested. Tech transfer is less a handover than a controlled re-discovery, compressed into months.

When a biologic leaves the development lab and moves to a manufacturing site — whether across a campus or across an ocean — a thick binder travels with it.

Single-use bioprocess bags on stainless frames
Bags are qualified per lot for extractables; the plastic is part of the product’s environment.Photo: Mark Stebnicki / Pexels

Lifted out · 02

The three common failure modes

  • Unidentified critical parametersvaried at the receiving site for the first time; no one knew they mattered
  • Informal raw-material controla supplier lot attribute controlled by habit, not specification, at the sending site
  • Compressed timelinesparallel workstreams creating interdependencies that individual plans did not anticipate
A chromatography skid with columns and tubing in a process suite
Between cycles the bed is stripped with caustic, on a protocol that is validated rather than improvised.Photo: Thirdman / Pexels